Mayport Naval Station

Client:

Manson Construction/ACOE,

Han Padron, OTAK Group


Location:

Mayport, Florida

Mayport Naval Station – Manson Construction/ACOE: Arc Surveying performed a low frequency hydrographic survey of the entire Mayport Naval Station Turning Basin and Entrance Channel for the USACE Maintenance Dredging Project. Volume calculations were completed.

Marine Corps Terminal – ACOE: Performed a multibeam hydrographic survey of the Marine Corps Terminal, obtaining hydrographic deata within the defined area of the Blount Island Turning Basin.

Marine Corps Terminal – Han Padron: Performed a hydrographic survey between stations 3+00 through 25+00 from front of dock face to edge of Federal Channel. Also performed pre and post dredging surveys.

USMC Blount Island – OTAK Group: Performed a hydrographic survey for the slipway projects, S-13, Berth 3 floating dock.